The rough house is also referred to as the "pre-decorated room." Most of the houses in this house have only doors and frames and no doors. The wall surface is only treated as a foundation without surface treatment. All exterior finishes outside the house, including balconies and rain covers, should be completed according to design documents. The installation of water and electricity for the rough house and the renovation steps are also issues that many people are concerned about. For the friend who first renovated, it is very necessary to have a simple understanding of the renovation steps of the rough house before doing home renovation work. If you want to make your new home decoration know, you must have a certain understanding of the rough house decoration. The following let everyone popularize the knowledge of water and electricity installation under the rough house . Blank room renovation process First, a clear decoration area, to understand the size of the wall. 1. Identify the area involved in the renovation process. Especially tiling area, wall paint area, wallpaper area, floor area. 2, clear the main wall size. In particular, it is necessary to design the wall size of the furniture later. Second, a reasonable demolition reform, the use of space. Including the demolition of walls, walls, shovel wall, demolition heating, change steel windows and so on. After the demolition of the completed garbage, it must be cleared up in time to ensure the cleanliness of the interior, but also to facilitate the construction. Hydroelectricity reconstruction, arrange the use of each space, try not to regret it. Bricks on the wall, a ceiling, and then think of adding sockets can be difficult. Therefore, be sure to determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc. Before the hydropower reform, the cabinet designer should come to the door to make the first measurement and help you determine the power and waterway reconstruction plan. Water heaters, it is also best to send someone to design the location of the power supply and the interface according to the model you have determined. Note: It is best to leave the power outlet on the wall under the basin for easy loading. The air-conditioning hole and power source should be placed on the wall of the bedside as much as possible to avoid air-conditioning blowing directly to people. Strong electricity and weak points must maintain a 20-centimeter gap. For example, a distance of 20 cm must be left between the outlet and the cable. Third, optimize the appearance of the pipeline to enhance the decorative effect. Pipeline In general, the bathroom is installed the most, bathroom decoration in our entire home decoration, is the most vexing place, not only to prevent slipping, but also to ensure the dry, so optimize the appearance of the pipe, not only play a role in moisture, but also To the effect of decoration. Fourth, the ground is essentially decorative (trick points). The ground is actually decorated (trick points). Before tiling, you must buy a floor drain. After finishing waterproofing and pulling hair, prepare a tiling. In addition to the normal tiling, the tiles are soaked in water and dried in the shade; the tattered tiles are left for cutting, and I personally emphasize the overall beauty of the tiling. Fifth, beautify the rough room walls and make the walls beautiful. The wallpaper is much better than the wall paint. After the wall paint is brushed, the oil trader will apply nitro-lacquer to the place where the wallpaper is to be applied. The paint can dry after the next day, and then the master can paste the wallpaper. We also started worrying that the wallpaper would dirty the painted white wall, but it was only known later that the wallpaper was a special clean job! Note: Do not open the window for ventilation within 48 hours after the wallpaper has been posted, let it slowly Dry. Say good to the master, if there is an odd place in individual places, trouble him to repair it. Six, socket installation arrangements. The socket panel can be installed in about half a day. Help fix it Blank house installation considerations 1, in the construction process, as much as possible to reduce unnecessary joints in the wall tube body, external faucet, toilet, basin no way. All the tubing joints are wrapped in hemp and white paint, tightened and placed in a horizontal and vertical position. In the event of a crossover on the ground pipe, the secondary pipe must be installed below the main pipe. Keep the overall water distribution on a horizontal line. 2. Precautions for decoration of rough house All the places where water is passed must be installed with water pipes and floor drains. When the pipes of pvc pipes are connected, they must be covered with special pvc glue. And note that when the horizontal drop is connected to the main sewer pipe embedded in the original blank house, it should remain stationary for 6 hours. 3. Precautions for decoration of rough house After the pipe is in place, you must use the pipe clamp to grip the pipe at the turning place or at the place where there is a stop or stop. Do not loosen the pipe. Water pipe fixing requires the use of a special pipe card. 4. The aluminum plastic pipe or PPR pipe used must be a qualified product after inspection and delivery. Hot and cold water pipes should use different colors. 5, the use of light pipe keel pipe as much as possible, cement tile tiling is the most prone to problems, so pay attention to the bubble water in place, use good quality cement. 6. Precautions for rough room renovation Kitchen hygiene should be done within the slot. 7. If the main sewer pipe embedded in the original rough room is not enough or not ideal or not in place, the sewer pipe can be re-opened in the floor according to the actual situation, and the pipe with fireproof glue can be used to seal the pipe around. In the newly sealed area, a 10mm high circle is surrounded by cement mortar. After solidifying for 48 hours, the circle is filled with water and permeated into the floor for 24 hours to see if there is any water seepage around the newly installed sewage pipe. Editor's summary: The above is related to the knowledge about the installation of hydropower installations in the rough house. It is for reference only and hopefully helps everyone. If you want to know more related information, you can pay attention to this website information. Hydropower installation Cam Latches,Hardware Latches,Toggles Hooks,Adjustable Toggle Latches Ningbo Hengchieh Locking Technology Co., Ltd. , https://www.hengchieh.com