Illustrated PPR tube installation (Photos)

1, before the installation date is determined, dig a good groove, make a good hole (about 15 yuan / month)


2. Workers come with materials/tools. Click on the number of tubes first and finally calculate it.


3、Communicate with workers first


4, after the measurement of blanking, see his hands special scissors


539) {this.resized=true; this.width=539;}" border=0>



5, tools and pressure equipment


539) {this.resized=true; this.width=539;}" border=0>



6. Rotate the material to be connected on both sides of the heat welder for about 1 minute to dissolve the material.


539) {this.resized=true; this.width=539;}" border=0>



7. Insert the two dissolved ends into each other and wait approximately 1 and a half minutes for the dissolved material to cool and bond.


8, impact drilling drilling installed wooden pillow, fixed pipe


539) {this.resized=true; this.width=539;}" border=0>



9, conduct stress tests


539) {this.resized=true; this.width=539;}" border=0>



10, 10 kg half-hour pressure can not drop more than 5%, installation acceptance is completed


539) {this.resized=true; this.width=539;}" border=0>

Piësa water heater installation decoration installation hydropower installation construction installation

Outdoor Swan Lights

Simulation Swan Lights,Outdoor Swan Lights,LED Swan Lights,Swan Lights of Gardens

Sichuan Kangruntengpu Photoelectric Technology Co., Ltd. , https://www.krtoplighting.com